Thirty seconds

What a year of unbid commercial work is worth

Rough is fine. You're looking for the order of magnitude rather than the cent.

jobs

The ones that came to you and never went out, for whatever reason. Count back over the last few months and use the average.

$ per job

Contract value, not your margin on it. If they range widely, use the middle of the range rather than your biggest one.

percent

Gross margin, the way you figure it. Whatever number you'd defend to your own accountant is the right one here.

percent

Bidding them all wouldn't win them all. If you're not sure, use your win rate on the commercial work you do bid, which is the closest thing to an answer either of us has.

Gross profit in a year of it $168,300 Already discounted by your own win rate, so this is the part you'd have kept, not the part you'd have quoted.
Contract value that went unbid $3,060,000 The whole year, before any win rate is applied. Not all of it was yours to win, which is exactly what the number above corrects for.
One job won $18,700
Every month $14,025
From what went unbid to what you would have kept Your own four figures
Contract value that went unbid $3,060,000
The share you would have won $765,000
Gross profit you would have kept $168,300

Each bar sits on the same scale. The last one is the honest size of it, after your own win rate and your own margin.

Change anything on the left and these move. Nothing is sent anywhere while you do it.

Your four figures and the arithmetic behind them, written out. No mailing list. Or and skip it entirely.

Before you take that number anywhere

What that number is, and what it isn't

It's gross profit, not revenue

The big figure is contract value times your own margin, so it's the money that would have stayed with you rather than the size of the jobs.

Your win rate is already in it

Nothing here assumes you'd have taken every job you priced. The headline figure is the discounted one, which is why it's smaller than the contract value under it.

Producing those bids costs something

This number doesn't net that off. If you want the other side of it, the companion calculator prices a year of bid production from four different figures.

The questions behind the arithmetic

What people ask about unbid work

Why doesn't unbid work show up anywhere in my numbers?

A job you lose shows up as a job you lost, because a number went out and came back. A job that came in and never got priced leaves nothing behind at all. Nothing was ever quoted, so there is nothing for a report to count. That gap is what this figure fills.

It's the one cost in a roofing company that has to be reconstructed from memory rather than pulled from a system.

Is the number gross profit or revenue?

Gross profit, at the margin you entered. The contract value is shown separately above it and it is a much bigger number. Gross profit is the more useful of the two, because it's what would have been left after the cost of doing the work.

Neither figure nets off what producing those bids would have cost you. The other calculator works that part out.

What win rate should I use?

Your own, on work like this. If you don't track it, use the share of commercial bids you send that turn into jobs, and round down rather than up. The whole figure is meant to be an order of magnitude rather than a number to the cent.

Rounding down is the safer error here. A figure you'd defend is worth more than a flattering one.

Does the calculator store what I put in?

No. The arithmetic runs in your browser and nothing leaves the page. If you want the figures back as one page you can keep, there's a form under the calculator that asks for an email address. That is the only point at which anything is sent anywhere.

What does CleverIntel do about any of this?

CleverIntel is commercial roofing software for flat and low slope work. It prices the roof off a negotiated national account, publishes the bid under your logo, and takes the signature. The point of it is that a job you were asked to price stops being a job you never got to.

It starts one step earlier too, with the commercial properties near you worth calling in the first place. The eight steps are set out here.

The fuller version

See it on one of your own roofs

Twenty minutes, and you watch your own market get scanned, a real commercial property get priced line by line, and the bid go out signed. Your four figures come over written out, and a time comes back with them.

Built by people who price commercial roofs.

CleverIntel™ came out of pricing real low slope work, which is why the questions it asks you are the ones you would ask standing on the roof.

Fill in the four fields and we'll get this over to you.

Your four figures from above come with it, so we aren't asking you to type them twice. We don't add you to a mailing list for this.

Got it.

Your one page comes back from a person's inbox, usually inside one business day. If you'd rather just talk, say so in the reply and we'll sort a time.